Bullet10
Test the system and cut the coupling to length from the front with Zurn''s patent-pending EZ-SETâ„¢ coupling option
Bullet5
Propel waste up to three times farther, reducing the possibility of low-flow system clog for overall plumbing system protection
Bullet6
Protect facilities from excessive loading with standard system design for loading up to 500 lb.
Bullet7
Install faster with labor saving features on a 30% lighter system
Bullet8
Reduce maintenance emergencies with carriers designed to optimize waste line carry
Bullet9
Maintain a sanitary environment with wall-mounted fixture
Line
Specification Drainage
Prop65
Cancer and Reproductive Harm - www.P65Warnings.ca.gov