Extra Data: Cleanout ships as a complete and assembled system, Durable construction stands up to tough environments, Intuitive design saves over 14 minutes per installation, Post-pour adjustment and tilt accessory package streamline setup and installation
Bullet5: Rough-in cover 3,000-lb load capacity handles heavy traffic, over and over
Bullet6: Protective grate sticker keeps debris from entering the system before its set and peels off without needing a razorblade
Bullet7: Design accommodates new construction and retrofit applications
Bullet8: Gas and water tight seal prevents drain penetrations
Bullet9: ASEE, ICC and IAPMO Approved
Country: China
Description: Zurn''s EZC floor drain cleanout saves contractors 14 minutes per installation thanks to its intuitive, integrated design. The fitting allows for post-pour adjustment and tilt correction, so you''re not slowed down finding the perfect slope